We arrived at church this past Sunday and found a foot of water standing in the basement of our addition due to the rains over the past week. Doug Hensley and Bob Brooks set up pumps to drain all the built up water. On Monday, the pert control service came out and treated the foundation for termite control. Today, Bob and his brother Jim installed all the decking for the sub-floor of the new offices. Here are the pictures.
Please follow and like us: