This week a lot of little things were accomplished in the office addition. The heating and air conditioning contractor continued his work installing the system. It is near completion. The railings on the back deck on the office addition were installed. The old window in the hallway by the Ladies’ restroom was replaced with a book case. The main door into the new offices was trimmed out and most of the inside moldings around the windows were installed. The “cutting in” of the ceiling and wall paint was finished and the necessary second coat of paint went on all the office walls.